Description
2021 Liebherr LTM 1450-8.1
- 30.864 km and 3.370 working hours (4-28-25)
- 85 meter boom
- 84 meter luffing jib
- 56 meter fixed jib
- 7 meter (K) jib adjustable
- 2 winches
- Runner 48t (H), 2sheaves
- New installed 20,5 R25 tires
- 16×8 drive
- 85t 3 sheave hook block (DH)
- 37,5t 1 sheave hook block (single)
- 12,7t one ball hook
- 134 T counterweight
- Airco in upper and lower cabin
- Camera system
- New installed boom removal
- Transport consoles for telescopic boom
- Prepared for Boom launce section 3-6
- Outrigger support plates 2,5×2,4 Meter